Machine documentation

The troubleshooting guide your machine never came with.

A guide, PM checklist and spares list, built from your manuals and your best tech’s know-how.

Hayward, CA · on site in the East Bay

First machine
$500every new client
Delivered in
5business days
Your team's time
1 hrabout, in total

From a real guide · Haas VF mill

121/2075

Low oil · lube reservoir empty

Axis lube is low or not building pressure.

Way lube

Do now

Fill with Haas-specified oil.
Run the axis lube test (F2).
Look for leaking fittings.

Call service if

The level is good and it returns: filter, line, pump or switch.

From the sample Haas VF guide, page 1. Follow your shop's safety and lockout/tagout rules.

Page 1 of the sample Haas VF mill alarm guide: a first-five-minutes checklist and five alarm entries, each with Do now and Call service if steps.
Sample · Haas VF mill alarm guide · page 1 of 5

The fix lives in one person's head.

When your best tech is off shift, the knowledge goes home with them. The manual is still on the shelf, and nobody has time to read it mid-fault.

Sound familiar?

  • Everything about that machine lives in one guy's head.
  • When he's off shift, a fault that takes him ten minutes takes us half a day.
  • The manual is 400 pages and nobody reads it.
  • I've got a new tech starting and nothing to hand him.

Four things, for one machine.

A maintenance documentation package your crew can use at the machine, on paper or on a phone.

  1. 01

    Troubleshooting guide

    pp. 1–3

    Organized by fault code and by symptom.

  2. 02

    Preventive maintenance checklist

    p. 4

    Daily, weekly and monthly tasks.

  3. 03

    Critical spares list

    p. 5

    What to keep on the shelf.

  4. 04

    QR code label

    on the machine

    Links to the digital copy.

    The QR label from the sample guide, with the line: Scan for this guide on any phone at the machine.
Page 4 of the sample guide: a preventive maintenance checklist split into daily, weekly, monthly, six-month and annual tasks, each tagged with the alarm it heads off.
Sample · preventive maintenance checklist · page 4 of 5

About one hour of your team's time.

  1. 01

    You send the manuals and history

    Your team

    The machine's manuals and any fault or work-order history you have.

  2. 02

    One interview with your lead tech

    Up to 60 min

    One recorded conversation with your most experienced technician.

  3. 03

    Omar drafts and checks every line

    Omar

    A technician writes your guide. AI-assisted tools speed up the drafting, and every line is checked by hand before you see it.

  4. 04

    You get the package

    Within 5 business days

    The guide, checklist, spares list and QR label.

  5. 05

    Your qualified person approves it

    1 revision round included

    Your own reviewer signs off. One round of revisions is included.

Your team's time, total

about 1 hour

Open the guide. See what you get.

The Haas VF mill sample: five pages of alarms, PM checks, critical spares and an alarm log. Select a page to read it full size.

  1. Page 1: first five minutes and alarms 1 to 5.
    p. 1 · Alarms 1–5
  2. Page 2: axes and spindle alarms.
    p. 2 · Axes, spindle
  3. Page 3: tool changer and coolant alarms.
    p. 3 · Tool changer
  4. Page 4: preventive maintenance checklist.
    p. 4 · PM checklist
  5. Page 5: critical spares and alarm log.
    p. 5 · Spares, log

Sample for format review; your qualified staff must approve machine-specific guidance before use. Haas is a trademark of Haas Automation, Inc. Mora Industrial Solutions is not affiliated with or endorsed by Haas Automation, Inc.

One flat fee per machine. Shown right here.

Your first machine
$500Pilot price for every new client’s first machine
Additional machines
$750–$1,500per machine, depending on complexity
Payment
50% at kickoff · 50% on delivery
Delivery
5 business days
Revisions
1 round included
Book a 15-minute call

The knowledge stays with your team.

Instead ofWhat's differentWhat it means for you
Maintenance softwareNo subscription, no setup, nothing to learnYou get the finished guide. Nobody on your team has to learn a tool.
Reliability consultanciesOne machine, one flat fee, 5 business daysA defined package for one machine, delivered within 5 business days.
Remote freelance writersLocal, on site, written by a working technicianBuilt from your own tech's knowledge, not just the manual.

Low risk

Half up front, half on delivery. Your own person approves the final document.

Low effort

About one hour of your team's time.

Your property

Manuals, data and recordings stay yours. The package is yours once paid. Your materials are used only for your job. An NDA is available before anything is shared.

Local

An East Bay technician who can walk your floor.

Written by someone who keeps machines running.

I’m Omar Mora, a working robotics and industrial automation technician in Hayward. I have more than six years of hands-on experience keeping equipment running. I turn your team’s know-how into documentation they can use at the machine.

Networks
EtherCAT and CAN bus
Controls
TwinCAT recovery procedures
Motion
Actuator and servo diagnostics
Wiring
Wire harness testing
Systems
High-precision electromechanical systems
Hands-on
6+ years in maintenance and automation troubleshooting
Illustration of an idle CNC spindle above a metal worktable.
Machine detail · AI-generated illustration

Clear about where this stops.

The package is reference documentation. Your own qualified staff review and approve it.

Included

  • Reference documentation for one machine
  • Built from your manuals, history and an interview with your lead tech
  • Reviewed and approved by your own qualified person

Not included

  • Lockout/tagout procedures, safety procedures or risk assessments
  • Electrical or mechanical design, or code compliance review
  • On-site repair work under this service
  • Engineering services. Not a licensed professional engineering firm.

The first product of a growing shop.

Only the first column is available today.

Now · available

  • Machine troubleshooting guides and preventive maintenance checklists

Next · not available yet

  • Downtime analysis reports from your own work-order history
  • Spare parts and obsolescence audits
  • Operator and maintenance manuals for machine builders and integrators

Later · not available yet

  • A troubleshooting assistant trained on your own manuals
  • Automation readiness assessments
  • Field troubleshooting

Pick your worst machine.

Book a 15-minute call with me. We’ll talk about the machine, the documentation you have and whether the package fits.

Book a 15-minute call

Hayward, CA · on site in the East Bay

Start with one page

Get a free first page for your machine.

I’ll send your first page within 24–48 hours of receiving your request and the machine information needed.

One machine. Add the year if you know it.

You’ll review the request and send it from your email app. Your details and materials are used only for your page.